Work Breakdown Structure

 Provide a WBS tool for Project Admin to assign tasks and check the plan’s progress.

Description

share this page via facebook share this page via LinkedIn share this page via Twitter share this page via Google+ share this page via email More sharing services

Project managers might need a tool to create tasks for every user story/requirement, assign tasks to an assignee, estimate the time spent in each user story, and view the progress of the whole iteration/plan, etc.. This is such a tool for managers to handle these scenarios.

This plugin provides a UI which is similar to MS Project so that user could operate easily. The page was separated into two areas: left side is about Work Item breakdown, and the right side is about the Gantt chart - each side could be collapsed to maximize the other side. Users can operate on both sides.

In task assignment, there will be a dialog to show the user's overall usage in recent days, so that the manager can choose the suitable user to take the task. Resource usage viewer was also provided for Project manager to see all the resources' usage in the project.

Dependency Control was enabled so that one task could be started only when the depended tasks were done.

Information

Vendor TeamLive (北京融工场科技有限公司)
Published Version 1.0 - April 2016
Categories
Price
Supported by Partner This extension is supported by a Siemens PLM Partner.
Requirements Polarion 2015+